SHAH ALAM, 20 February 2018: MRCB George Kent, the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane diversions at Jalan Meru from 21 February to 20 May 2018 for Phase 1 and 12 March to 11 June 2018 for Phase 2. The lane diversions are to facilitate the LRT3 bore pile works in the area as approved by the Klang Municipal Council and Selangor State Public Works Department.

Phase 1: 21 February to 20 May 2018
Lane diversion will begin from Yao Shan Fang Chinese Medicine Clinic until the entrance/exit of TM Point (Both Setia Alam-bound and Klang Parade-bound). Traffic will be diverted as indicated in the GREEN arrows in Map 1.

Phase 2: 12 March to 11 June 2018
Lane diversion will begin in front of Pasar Besar Klang until the entrance/exit of Pasar Besar Klang (Both Setia Alam-bound and Klang Parade-bound). Traffic will be diverted as indicated in the GREEN arrows in Map 2.

Both diversions are as shown in the maps below:

Map 1: Diversion for Phase 1 (21 February – 20 May 2018)

Map 2: Diversion for Phase 2 (12 March – 11 June 2018)

We apologise for any inconvenience caused to the public.

For public enquiries, kindly contact LRT3 hotline at 1 800 18 2585.

For media enquiries, contact:
Ivlynn Yap
Specialist, PR & Communications
MRCB George Kent Sdn Bhd
03-50336857
ivlynn.yap@mrcbgk.com

Vanessa Song, WPC PR & Stakeholder Management
012-232 3782
vanessas@sunway.com.my

Dennis Li, WPC PR & Stakeholder Management
011-3919 1311
lich@sunway.com.my

About Prasarana Malaysia Berhad

Established in 1998 and operational since 2002, Prasarana Malaysia Berhad is the asset owner and operator of the country’s three LRT networks and the KL Monorail; in addition to the bus services of Rapid KL, Rapid Penang, Rapid Kuantan and Rapid Kamunting.

Beyond the efforts to transform the country’s public transport services via Rapid Rail Sdn Bhd and Rapid Bus Sdn Bhd, Prasarana has also established Prasarana Integrated Management and Engineering Services Sdn Bhd (PRIME) to provide management and engineering consultancy services, Prasarana Rail and Infrastructure Projects Sdn Bhd (PRAISE) to manage major projects under the Group which included the LRT Line Extension Project; Prasarana Integrated Development Sdn Bhd (PRIDE) to undertake commercial and transit-oriented development projects to further strengthen the performance of the company; and Prasarana Integrated Solution & Management (PRISM) for the management of insurance practices and businesses.

About MRCB George Kent (MRCB GK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4th September 2015 as the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3).

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest home-grown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

About The Light Rail Transit Line 3 (LRT3)

The LRT3 envisages to connect 2 million people between Bandar Utama and Klang by 2020. Developed in line with Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV.

For more information, visit www.lrt3.com.my and follow @myLRT3.

-->
Translate »