Date  13 September to 29 October 2018
Time  10.00 pm to 6.00 am (Monday to Friday)
Duration  33 days
Reason  To facilitate preliminary works such as utilities relocation, soil investigation, site clearing, road line marking, installation of flexible post and     plastic/ concrete barrier at Lebuh Bandar Utama for the LRT3 project.

 

SHAH ALAM, SELANGOR – 10 September 2018: MRCB George Kent Sdn Bhd (MRCBGK), the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary lane closure at the slip road to Lebuh Bandar Utama to facilitate preliminary works for the LRT3 project starting from 13 September to 29 October 2018.

During the temporary closure which will be from 10.00 pm to 6.00 am the next day, motorists using the slip road to Lebuh Bandar Utama before the Damansara toll (Klang Bound) heading towards Lebuh Bandar Utama (BU1 and BU2 Bound) will be diverted to Jalan Tropicana Selatan 1, Persiaran Tropicana and Lebuh Bandar Utama as indicated in GREEN arrows in the map below:

 

Traffic will be controlled by flagmen who will be stationed at the allocated points and directional signages will also be displayed during the closure. The road closure will ONLY take place during the time period stated above.

We apologise for any inconvenience caused to the public.

For public enquiries, contact LRT3 hotline at 1 800 18 2585.

 

–ENDS–

 

For media enquiries, contact:

Lim Siew May

PR & Communications Manager

MRCB George Kent Sdn Bhd

03-5033 6857

siewmay.lim@mrcbgk.com

 

Vanessa Vivekananda

PR Manager

Mudajaya Corporation Sdn Bhd

03-77356500

vanessa.vivekananda@mudajaya.com

 

 

ABOUT MRCB GEORGE KENT (MRCB GK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4th September 2015 as the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3).

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest home-grown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3)

The LRT3 envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, visit www.lrt3.com.my and follow @myLRT3

 

 

 

 

-->
Translate »