SHAH ALAM, SELANGOR – 21 DECEMBER 2020: MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will continuation of the long-term road closures and traffic diversions on the slip road heading to Lebuh Bandar Utama (BU11/ BU12-bound) to facilitate LRT3 project-related works from 21 December 2020 to 30 April 2021, (Monday to Sunday) for 24 hours.

During the closures, motorists heading towards Lebuh Bandar Utama via the slip road on the Sprint Highway (Klang-bound) will be diverted as indicated on the map below:

Map 1 (For light vehicles) :

 

For heavy vehicles, drivers will need to use the alternative route via the slip road on Jalan Tropicana Selatan 1, passing Jalan Tropicana Selatan and Persiaran Tropicana before proceeding to Lebuh Bandar Utama as indicated on the map below:

Map 2 (For heavy vehicles):

 

The diversions are implemented following the approval from the Petaling Jaya City Council (MBPJ). Throughout the Conditional Movement Control Order (CMCO) period, we will be following the guidelines of the Ministry of International Trade and Industry (MITI) and the Ministry of Health (MOH) when carrying out our construction activities.

We apologise for any inconvenience caused to the public.

For public enquiries, kindly contact the LRT3 hotline at 1 800 18 2585.

 

–ENDS–

 

For media enquiries, please contact:

Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6857
siewmay.lim@mrcbgk.com

 

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).

On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the contractor.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT

The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3.

-->
Translate »