SHAH ALAM, SELANGOR – 16 August 2021: MRCB George Kent Sdn Bhd (MRCBGK), the main contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent road closures and traffic diversions to facilitate ‘U-trough’ launching and LRT3 project-related works at Bulatan Kota (from the slip road of Persiaran Sultan Ibrahim, Jalan Meru and Jalan Kapar-bound), Jalan Meru (from the junction of Jalan Gelugor to LHDN, Setia Alam-bound) and Jalan Kapar (from the junction of Jalan Raja Bot to Wisma MAIS, Jalan Mantin-bound), Klang from 18 August 2021 to 30 November 2021, Monday to Sunday, 10:00 p.m to 5:00 a.m.

During the closures, motorists will be diverted as follows:

  • Motorists from Jalan Gelugor heading towards Bulatan Kota will be diverted to Jalan Meru, Jalan Sireh and Bulatan Seratus to head towards Kuala Lumpur or Banting via Persiaran Sultan Ibrahim.
  • Motorists from Banting heading towards Bulatan Kota will be diverted to Persiaran Sultan Ibrahim (Kuala Lumpur-bound) and will be required to enter Klang town to head towards Jalan Meru and Jalan Kapar.
  • Motorists from Jalan Raja Bot will be diverted to Jalan Kapar, Jalan Mantin, Jalan Sireh and Bulatan Seratus before heading towards Kuala Lumpur or Banting via Persiaran Sultan Ibrahim.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The diversions are implemented following the approval from IPD Klang Selatan (PDRM), the Klang Public Works Department (JKR Klang) and Klang Municipal Council (MPK). Throughout the National Recovery Plan Phase 1, we will be following the guidelines of the Ministry of International Trade and Industry (MITI) and the Ministry of Health (MOH) when carrying out our construction activities.

We apologise for any inconvenience caused to the public and greatly appreciate your kind understanding.

For public enquiries, please contact the LRT3 hotline at 1 800 18 2585.

 

-ENDS-

 

For media enquiries, please contact:

Lim Siew May

Media Manager, PR & Communications

MRCB George Kent Sdn Bhd

03-5033 6857

siewmay.lim@mrcbgk.com

 

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).

On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the main contractor.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT

The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3

-->
Translate »