On 15th November 2016, Prasarana Malaysia Bhd and MRCB George Kent Sdn Bhd held a tender briefing for the LRT3’s “design, manufacture, supply, delivery, installation, testing and commissioning of telecommunication system for Bandar Utama – Johan Setia”. Present at the briefing was Mr Ong Gin Lip, Project Director, MRCBGK and Mr. George Josef Pauli, Deputy Project Director-System, MRCBGK. Also in attendance were the prequalified contractors.

-->
Translate »