U-Trough Girder
With its capability of reducing installation time, one U-Girder can be installed within a day and comes with an integrated design alongside a built-in noise barrier to ensure minimal disruption to the surrounding areas.
As of April 2023, there are a total of 2,040 U-trough girders throughout the LRT3 line which have been cast and installed by MRCB.
![](https://www.lrt3.com.my/wp-content/uploads/2024/01/10-2.jpg)
Segmental Box Girder
The Segmental Box Girder (SBG) is not an efficient structure. The structure is generally heavy with slower construction speed as compared to the U-Girder. Installation time per segment can take up to 3 days.