Tender briefing on 25 May 2017 (supply, delivery, installation, testing and commissioning of escalators for package ESC (Eastern & Western) Light Rail Transit 3 (LRT3) from Bandar Utama – Johan Setia)
Representatives from pre-qualified contractors registering their attendance.
Mr. Rahizad Rashid, Vice President, Prasarana Rail and Infrastructure Projects Sdn Bhd (PRAISE), delivering the opening remarks.
Mr. Chan Wai Loon, Design Engineer, Infrastructure, Engineering & Design Department (IED), MRCBGK, presenting the technical aspects of the package.
Mr. Noeh Niqmann Zainal Abidin, certified integrity officer, Prasarana, presenting the integrity aspects that all pre-qualified contractors need to adhere to.