-
-
Representatives from the pre-qualified contractors registering their attendance.
-
-
Mr. George Josef Pauli, Deputy Project Director – System, MRCBGK, delivering the opening remarks.
-
-
Mdm. Faith Tiong, Senior Manager, Contracts Management, MRCBGK, presenting on the tender requirements.
-
-
Ms. Nor Muliati Awatif Norazman, representative of Industrial Collaboration Programme (ICP), Prasarana, presenting the procurement programme.
-
-
Representatives from the pre-qualified contractors participating in the integrity pledge led by Mr. Noeh Niqmann Zainal Abidin, certified integrity officer, Prasarana.
-->
Translate »