Date  23 June 2018 to 8 September 2018
 Time  24 Hours
 Duration  78 days
 Reason  To facilitate LRT3 bore piling works and water pipe relocation Package GS07-008

SHAH ALAM, 22 June 2018: MRCB George Kent, the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of lane diversions in front of Pasar Besar Klang until Yao Shan Fang, the Chinese Medical Clinic (Klang Parade-bound). The lane diversions will continue from 23 June 2018 to 8 September 2018. Motorists will be diverted as indicated by the GREEN arrows in the map.

The diversion is implemented following approval from Public Works Department (JKR) and the Klang Municipal Council. Motorists are reminded to exercise caution and adhere to advance warning signs when travelling in the area during the construction period.

The lane diversions are as shown in the map below:

We apologise for any inconvenience caused to the public and greatly appreciate your kind understanding and patience as we build LRT3 for the betterment of the future, and in improving Klang Valley’s public transport system.

For public enquiries contact LRT3 hotline at 1 800 18 2585.

–ENDS–

 

For media enquiries, contact:

Syukrina Mohtar
PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6860
syukrina@mrcbgk.com

Vanessa Song, WPC PR & Stakeholder Management
Sunway Construction Sdn Bhd
012-232 3782
vanessas@sunway.com.my

 

ABOUT MRCB GEORGE KENT (MRCBGK)
MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4th September 2015 as the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3). MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest home-grown railway system specialist in Malaysia. MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3)
The LRT3 envisages to connect 2 million people between Bandar Utama and Klang by 2020. Developed in line with Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, visit www.lrt3.com.my and follow @myLRT3

-->
Translate »