SHAH ALAM, SELANGOR – 29 January 2020 MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of lane closure and traffic diversion to facilitate Indah Water Konsortium (IWK) sewerage relocation works for the LRT3 project in front of the shoplots on Jalan Plumbum U7/U from 1 February 2020 to 30 April 2020 (Monday to Sunday) from 9:00 a.m. to 6:00 p.m. and 11:00 p.m. to 5:00 a.m.
During the temporary closure, the affected parking bays along Jalan Plumbum U7/U and several parking bays along Jalan Plumbum T7/T will be closed. One lane will be made available to motorists on Jalan Plumbum U7/U as indicated by the arrows on the map below:
We apologise for any inconvenience caused to the public and greatly appreciate your kind understanding and patience as we build LRT3 for the betterment of the future, and in improving Klang Valley’s public transport system.
For public enquiries, kindly contact the LRT3 hotline at 1 800 18 2585.
–ENDS–
For media enquiries, please contact:
Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6857
siewmay.lim@mrcbgk.com
ABOUT MRCB GEORGE KENT (MRCBGK)
MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).
On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the contractor.
MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.
MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.
ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT
The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity
to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3.