SHAH ALAM, SELANGOR – 14 July 2020 MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that the motorcycle lane and emergency lane on KM12 of Federal Highway (KL-bound) will be closed to facilitate the construction of an alternative access route to the motorcycle lane from 17 July 2020 to 31 July 2020, (Monday to Sunday) from 9:00 a.m. to 5:00 a.m.

During the 1.5 kilometres of motorcycle lane closure, motorcyclists on Persiaran Bandar Raya heading towards Federal Highway will be diverted to the leftmost lane of Persiaran Bandar Raya. 50 metres of the emergency lane on KM12 of Federal Highway (KL-bound) will be closed.

The temporary closures and traffic diversions are indicated on the map below:

 

 

We apologise for any inconvenience caused to the public and greatly appreciate your kind understanding and patience as we build LRT3 for the betterment of the future, and in improving Klang Valley’s public transport system.

Throughout the Recovery Movement Control Order (RMCO) period, we will be following the guidelines of the Ministry of International Trade and Industry (MITI) and the Ministry of Health (MOH) when carrying out our construction activities.

For public enquiries, kindly contact the LRT3 hotline at 1 800 18 2585.

 

–END–

 

For media enquiries, please contact:

Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6857
siewmay.lim@mrcbgk.com

 

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).

On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the contractor.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT

The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity

to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3.

-->
Translate »