SHAH ALAM, SELANGOR – 21 MAY 2021: MRCB George Kent, the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be temporary lane closures and traffic diversions on Persiaran Kerjaya (Kuala Lumpur-bound) and Jalan Lapangan Terbang Subang (Lapangan Terbang Subang & Federal Highway-bound) to facilitate LRT3 project-related works from 24 May 2021 to 12 June 2021 (Monday to Sunday) from 11:00 p.m. to 5.00 a.m. at the following locations:
Stage 1:
Both lanes heading towards Jalan Lapangan Terbang Subang will be closed from 24th May 2021 to 7th June 2021. During the closures, motorists will be diverted as below:
Stage 2:
The rightmost lane on Persiaran Kerjaya and leftmost lane on Jalan Lapangan Terbang Subang will be closed from 25th May 2021 to 8th June 2021. During the closures, one (1) lane will be made available to motorists from Persiaran Kerjaya and Federal Highway heading towards Kuala Lumpur as shown on the map below:
Stage 3:
Two (2) lanes on Jalan Lapangan Terbang Subang heading towards Kuala Lumpur will be closed from 26th May 2021 to 9th June 2021. During the closures, motorists will be diverted to the right lane as shown on the map below:
Stage 4:
The two (2) lanes heading towards Lapangan Terbang Subang will be closed from 27th May 2021 to 10th June 2021. During the closures, motorists will be diverted to the left lane as shown on the map below:
Stage 5:
The rightmost lane heading towards Lapangan Terbang Subang and the two lanes heading towards Federal Highway will be closed from 28th May 2021 to 11st June 2021. During the closures, one (1) lane will be made available to motorists heading towards Federal Highway and motorists heading towards Lapangan Terbang Subang will be diverted to the left lane as shown on the map below:
Stage 6:
Three (3) lanes heading towards Kuala Lumpur will be closed from 29th May 2021 to 12nd June 2021. During the closures, motorists heading towards Kuala Lumpur will be diverted to the right lane as shown on the map below:
The diversions are implemented following the approval from the Jabatan Kerja Raya Daerah Petaling (JKR Petaling). Throughout the Movement Control Order (MCO) period, we will be following the guidelines of the Ministry of International Trade and Industry (MITI) and the Ministry of Health (MOH) when carrying out our construction activities.
We apologise for any inconvenience caused to the public.
For public enquiries, kindly contact the LRT3 hotline at 1 800 18 2585.
–END–
For media enquiries, please contact:
Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6857
ABOUT MRCBGEORGE KENT (MRCBGK)
MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).
On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the contractor.
MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.
MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.
ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT
The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3.