KUALA LUMPUR – 11 AUGUST 2023: Setia Utama LRT 3 Sdn Bhd, the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary closure of the motorcycle bridge at PLUS highway (Damansara and Klang bound) near Petron and BHP petrol stations to facilitate LRT3 project-related works from 14 August 2023 to 30 August 2023, (Monday to Saturday), from 10.00 pm to 5.00 am.

During the closure, motorcyclists from Jalan Bridge 21/64 or Jalan Masjid heading to PLUS highway (Klang bound) will need to make a U turn at the slip road on SPRINT highway (Damansara bound). Motorcyclists from Jalan Kenanga heading to PLUS Highway (Damansara bound) will need to go to slip road at Lebuh Bandar Utama and turn into PLUS Highway (Damansara bound) as shown in the map below:

The diversions are implemented following the approval from PLUS Malaysia Berhad (PLUS).

We apologise for any inconvenience caused to the public.

For public enquiries, please contact the LRT3 helpline at 1 800 18 2585.

-ENDS-

ABOUT SETIA UTAMA LRT 3 SDN BHD 

(Formerly known as MRCB George Kent Sdn Bhd)

Setia Utama LRT 3 Sdn Bhd is a wholly owned subsidiary of Malaysian Resources Corporation Berhad (MRCB), the country’s pioneer Transit Oriented Developer and a leading urban property and construction company, listed on the Main Market of Bursa Malaysia Securities Berhad since 1971.

Setia Utama LRT 3 Sdn Bhd is the main contractor of the LRT3 project providing the LRT3 project with a highly skilled team experienced in transit projects, with tailored and cost-effective solutions in a collaborative and supportive manner for the project owner, Prasarana Malaysia Bhd. The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang. Developed in line with the Greater Kuala Lumpur/Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV.

For more information, please visit www.lrt3.com.my and follow @myLRT3.

__________________________________________________________________________________

MEDIA CONTACT

Liyana Yusoff / Emir Shaukey Hendry

Manager / Executive – PR & Communications

Setia Utama LRT 3 Sdn. Bhd.

03- 7688 9298  

prcomms@kvlrt3.com

-->
Translate »