KUALA LUMPUR – 28 MARCH 2024: Setia Utama LRT 3 Sdn Bhd, the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of intermittent road closures and traffic diversions at Jalan Bridge 21/64 (from Petron to Kayu Ara Business Park) to facilitate LRT3 project-related works from 1 April 2024 to 1 July 2024, (Monday to Saturday), from 10.00 pm to 6.00 am at the following locations:

Location 1: Both lanes at Jalan Bridge 21/64 in front of the housing area to the junction at Jalan PJU 6A/3 (near Kayu Ara Business Park) will be closed.

  • Motorists from Jalan Bridge 21/64 near Petronas heading towards Kayu Ara Business Park will be diverted by making a U-turn opposite the Proton Car Dealership back to Jalan Masjid and then to Lorong Masjid.
  • Motorists from Kayu Ara Business Park heading towards SPRINT highway (Damansara-bound) will be diverted to Lorong Masjid and then to Jalan Masjid.

Location 2: Both lanes at Jalan Bridge 21/64 in front of the parking lot and the housing area will be closed.

  • Motorists from Jalan Bridge 21/64 near Proton Car Dealership heading towards Kayu Ara Business Park will be diverted by making a U-turn opposite the Proton Car Dealership back to Jalan Masjid and then to Lorong Masjid.
  • Motorists from Kayu Ara Business Park heading towards SPRINT highway (Damansara-bound) will be diverted by making a U-turn opposite the housing area at Jalan Bridge 21/64 to Lorong Masjid and then to Jalan Masjid. 

Location 3: Both lanes at Jalan Bridge 21/64 in front of Petronas NGV and Proton will be closed.

  • Motorists from Jalan Bridge 21/64 near Petronas heading towards Kayu Ara Business Park will be diverted by making a U-turn near Petronas back to Jalan Masjid and then to Lorong Masjid.
  • Motorists from Kayu Ara Business Park heading towards SPRINT highway (Damansara-bound) will be diverted by making a U-turn near the housing area at Jalan Bridge 21/64 to Lorong Masjid and then to Jalan Masjid.

Location 4: Both lanes at Jalan Bridge 21/64 in front of the empty land (next to the traffic lights) to Petronas NGV will be closed.

  • Motorists at Jalan Bridge 21/64 from Petron heading towards Kayu Ara Business Park will be diverted by turning to Jalan Masjid and then to Lorong Masjid.
  • Motorists from Kayu Ara Business Park heading towards SPRINT highway (Damansara-bound) will be diverted to Lorong Masjid and then to Jalan Masjid.

Location 5: Both lanes at Jalan Bridge 21/64 near Petron and Perodua will be closed.

  • Motorists from Plus Highway (Damansara-bound) heading to Jalan Masjid will be diverted to Jalan Melor 1.

The diversions are implemented following the approval from Petaling Jaya City Council (MBPJ).

We apologise for any inconvenience caused to the public.

For public enquiries, kindly contact the LRT3 helpline at 1 800 18 2585 from Monday to Friday: 8.30am to 5.30pm (excluding Public Holiday).

–END–

ABOUT SETIA UTAMA LRT 3 SDN BHD 

(Formerly known as MRCB George Kent Sdn Bhd)

Setia Utama LRT 3 Sdn Bhd is a wholly owned subsidiary of Malaysian Resources Corporation Berhad (MRCB), the country’s pioneer Transit Oriented Developer and a leading urban property and construction company, listed on the Main Market of Bursa Malaysia Securities Berhad since 1971.

Setia Utama LRT 3 Sdn Bhd is the main contractor of the LRT3 project providing the LRT3 project with a highly skilled team experienced in transit projects, with tailored and cost-effective solutions in a collaborative and supportive manner for the project owner, Prasarana Malaysia Bhd. The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV.

For more information, please visit www.lrt3.com.my and follow @myLRT3.

__________________________________________________________________________________

MEDIA CONTACT

Liyana Yusoff / Shazmyir Abdul Rahman

Manager /Senior Executive – PR & Communications

Setia Utama LRT 3 Sdn. Bhd.

03- 7688 9298  

prcomms@kvlrt3.com

-->
Translate »