Date  30 January to 3 April 2019
Time  Monday to Friday                                   : 10:00 p.m. to 6:00 a.m.

 Saturday, Sunday and Public Holiday : No construction activities

Duration   2.5 months
Reason  To facilitate works for TNB utility relocation, Telekom Malaysia cable relocation and SYABAS water pipe relocation at the slip road nearby     Petronas and Shell stations after Subang Toll.

 

SHAH ALAM, SELANGOR – 28 January 2019: MRCB George Kent, the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions at the slip road nearby Petronas and Shell stations after Subang Toll from 30 January to 3 April 2019.

The closures will be implemented in stages, and each stage will be conducted intermittently, starting from the slip road at the entrance of Petronas after Subang Toll until Plaza Glomac.

 

Stage 1  

Partial closures on the left lane at the entrance and exit of Petronas and Shell stations after Subang Toll are to facilitate works for TNB utility relocation, Telekom Malaysia cable relocation and SYABAS water pipe relocation.

Stage 2

Partial closures on the left lane in between the entrance and exit of Petronas and Shell stations after Subang Toll, as well as the island at Plaza Glomac are to facilitate works for TNB utility relocation, Telekom Malaysia cable relocation and SYABAS water pipe relocation.

 

We apologise for any inconvenience caused to the public.

 

For public enquiries, kindly contact the LRT3 hotline at 1 800 18 2585.

 

–ENDS—

 

Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd

03-5033 6857

siewmay.lim@mrcbgk.com

 

Salmi Azuriza Che Ali

PR & Stakeholder Management

WCT Bhd

012-6546905

salmi.azuriza@wct.my

 

ABOUT MRCB GEORGE KENT (MRCB GK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4th September 2015 as the Project Delivery Partner (PDP) of the Light Rail Transit 3 (LRT3) project.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3)

The LRT3 envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3.

 

-->
Translate »