Date   25 March 2019 to 26 May 2019
Time   8.00 a.m. to 6.00 p.m. (Monday to Friday)
Duration   44 days
Reason   To facilitate utilities relocation works on Jalan SS 21/38, Damansara Utama for the LRT3 project.

 

SHAH ALAM, SELANGOR – 19 March 2019: MRCB George Kent Sdn Bhd (MRCBGK), the main contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary lane closure on Jalan SS 21/38, Damansara Utama to facilitate preliminary works for the LRT3 project starting from 25 March 2019 to 26 May 2019 from 8.00 a.m. to 6.00 p.m.

During the temporary closure, motorists using this road will be diverted by a flagman as indicated by the GREEN arrows on the map below:

 

 

Traffic will be controlled by a flagman using the “Stop and Go” method of traffic flow. The road closure will ONLY take place during the time period stated above.

 

We apologise for any inconvenience caused to the public.

For public enquiries, please contact the LRT3 hotline at 1 800 18 2585.

 

–ENDS–

 

For media enquiries, please contact:

Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd

03-5033 6857

siewmay.lim@mrcbgk.com

 

Vanessa Vivekananda

PR Manager

Mudajaya Corporation Sdn Bhd

03-77356500

vanessa.vivekananda@mudajaya.com

 

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).

On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the main contractor.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT

The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3

 

-->
Translate »