SHAH ALAM, SELANGOR – 30 December 2019: MRCB George Kent Sdn Bhd (MRCBGK), the main contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of road closures and traffic diversions at the following locations below:

 

Closure A: Persiaran Bukit Raja, Klang

(1 January 2020 to 31 December 2020 Intermittent closure, 10 p.m. to 5 a.m.)

 Purpose: To facilitate launching and other LRT3 construction works.

There will be a continuation of intermittent full road closures and traffic diversions along Persiaran Bukit Raja, Klang (Grand Sepadu Highway-bound and AEON-bound). During the day, the closures will be re-opened, and traffic will resume as normal. During the closures, motorists will be diverted as indicated on the map below:

 

 

Closure B: Persiaran Tengku Ampuan Rahimah, Klang

(1 January 2020 to 31 December 2020, Intermittent closure, 10 p.m. to 5 a.m.)

 Purpose: To facilitate pier cap launching works for the LRT3 project.

There will be a continuation of intermittent closure of right lanes (on both-bounds) of Persiaran Tengku Ampuan Rahimah for a total stretch of 500m during the night. During the day, the closures will be re-opened, and traffic will resume as normal. During the intermittent closures, motorists will be diverted as indicated on the map below:

 

 

 

Closure C: Jalan Tun Abdul Razak and Persiaran Tengku Ampuan Rahimah, Klang

(1 January 2020 to 30 June 2020, 24 hours)

 Purpose: To facilitate water pipe relocation works for the LRT3 project.

There will be a continuation of left-most lane closures on Jalan Tun Abdul Razak and Persiaran Tengku Ampuan Rahimah (Banting-bound). During the closure, motorists will be diverted as indicated on the map below:

 

 

We apologise for any inconvenience caused to the public.

 

For public enquiries, please contact the LRT3 hotline at 1 800 18 2585.

 

-ENDS-

 

For media enquiries, please contact:

Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6857
siewmay.lim@mrcbgk.com

 

Vanessa Song
WPC PR & Stakeholder Management
Sunway Construction Sdn Bhd
012-232 3782
vanessas@sunway.com.my

 

ABOUT MRCB GEORGE KENT (MRCBGK)

MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).

On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the main contractor.

MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.

MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.

 

ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT

The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3

 

-->