SHAH ALAM, SELANGOR – 30 December 2019: MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closures and traffic diversions to facilitate utilities relocation, bored pile, installation of cofferdam, pier cap, pier and pier head works as well as launching of U-Girder for the LRT3 project.
The road closures will take place at Jalan Lontar Peluru 13/39 slip roads, in front of Stadium Malawati (both Persiaran Sukan and Giant Shah Alam bound) from 1 January 2020 to 31 May 2020 (Monday to Sunday) for 24 hours.
During this time, motorists heading towards Jalan Lontar Peluru 13/39 from Persiaran Sukan will be diverted to Jalan Tukul Besi 13/41 as shown in the map below:
We apologise for any inconvenience caused to the public and greatly appreciate your kind understanding and patience as we build LRT3 for the betterment of the future, and in improving Klang Valley’s public transport system.
For public enquiries, kindly contact the LRT3 hotline at 1 800 18 2585.
–ENDS—
For media enquiries, please contact:
Lim Siew May
Media Manager, PR & Communications
MRCB George Kent Sdn Bhd
03-5033 6857
siewmay.lim@mrcbgk.com
Hanita Harun
Public Relations & Stakeholder Management
Gabungan Strategik Sdn Bhd
013-5755667
hanita@gbg.com.my
ABOUT MRCB GEORGE KENT (MRCBGK)
MRCB George Kent Joint Venture (MRCB George Kent) was appointed on 4 September 2015 as the Project Delivery Partner (PDP) of Light Rail Transit 3 (LRT3).
On 17 October 2018, the PDP model was replaced with a fixed price contract regime, making MRCB George Kent the contractor.
MRCB is currently the largest developer cum contractor of Transit Oriented Developments (TODs) in Malaysia, while George Kent is the largest homegrown railway system specialist in Malaysia.
MRCB George Kent brings to the LRT3 project a highly-skilled and professional staff pool experienced in transit projects, with tailored and cost-effective solutions specific to Prasarana’s needs in a collaborative and supportive manner.
ABOUT THE LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT
The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang by 2024. Developed in line with the Greater Kuala Lumpur/ Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV. For more information, please visit www.lrt3.com.my and follow @myLRT3.