KUALA LUMPUR – 29 AUGUST 2023: Setia Utama LRT 3 Sdn Bhd, the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent lane closures and traffic diversions on PLUS and SPRINT highway (Klang and Damansara-bound, near Jalan Bridge 21/64) to facilitate LRT3 project-related works from 1 September 2023 to 31 October 2023 (Monday to Saturday),11.00 p.m. to 5.00 a.m. at the following locations:

Closure 1: Slip road from Lebuh Bandar Utama (BU11-bound) to PLUS highway (Damansara-bound) nearby Soon Meng Auto, the left lane of PLUS Highway (Damansara-bound) opposite Ming Tien, and the right lane of PLUS Highway (Damansara-bound) opposite Nissan Nikaijaya will be closed.

Closure 2: Right lane of slip road from Lebuh Bandar Utama (BU11-bound) to PLUS highway (Damansara-bound) nearby Ming Tien, the left lane of PLUS Highway (Damansara-bound) opposite Winho, both lanes at Kayu Ara Interchange and both lanes of SPRINT Highway (Damansara-bound) opposite Petron will be closed.

  • Motorists from Lebuh Bandar Utama heading towards SPRINT highway (Damansara-bound) will be diverted via contra flow opposite Winho.
  • Motorist from SPRINT highway (Klang-bound) heading towards PLUS highway (Klang bound) will be diverted to the left lane of the SPRINT highway (Klang bound) opposite Petron.
  • Motorist from PLUS highway (Damansara-bound) heading towards SPRINT highway (Damansara-bound) will be diverted via contra flow.
  • Motorists from Lebuh Bandar Utama heading towards Jalan Melur 1 will be diverted to the left-most lane of PLUS highway (Damansara-bound).

At one time, only one closure will be implemented. The diversions are implemented following the approval from Lembaga Lebuhraya Malaysia (LLM).  

We apologise for any inconvenience caused to the public.

For public enquiries, please contact the LRT3 helpline at 1 800 18 2585 from Monday to Friday: 8.30am to 5.30pm (excluding Public Holiday).

-ENDS-

ABOUT SETIA UTAMA LRT 3 SDN BHD 

(Formerly known as MRCB George Kent Sdn Bhd)

Setia Utama LRT 3 Sdn Bhd is a wholly owned subsidiary of Malaysian Resources Corporation Berhad (MRCB), the country’s pioneer Transit Oriented Developer and a leading urban property and construction company, listed on the Main Market of Bursa Malaysia Securities Berhad since 1971.

Setia Utama LRT 3 Sdn Bhd is the main contractor of the LRT3 project providing the LRT3 project with a highly skilled team experienced in transit projects, with tailored and cost-effective solutions in a collaborative and supportive manner for the project owner, Prasarana Malaysia Bhd. The LRT3 project envisages to connect 2 million people between Bandar Utama and Klang. Developed in line with the Greater Kuala Lumpur/Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will be a key feature in extending rail connectivity to the Western Corridor of GKL/KV.

For more information, please visit www.lrt3.com.my and follow @myLRT3.

__________________________________________________________________________________

MEDIA CONTACT

Liyana Yusoff / Emir Shaukey Hendry

Manager / Executive – PR & Communications

Setia Utama LRT 3 Sdn. Bhd.

03- 7688 9298  

prcomms@kvlrt3.com

-->
Translate »