Media Release

 

 
 
12 August 2022

Media Release: Lane closure and traffic diversion at the slow lane of the SPRINT Highway near PETRON Damansara Kayu Ara, (Damansara-Bound) to facilitate LRT3 project-related works from 17 August 2022 to 28 February 2023

KUALA LUMPUR – 12 AUGUST 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a lane closure and traffic diversion at the slow lane of the SPRINT Highway near PETRON Damansara Kayu Ara, (Damansara-Bound) to facilitate
Read More

 
 

 
 
12 August 2022

Media Release: Road closure and traffic diversion on Jalan Batu Nilam (near Lotus’s Bukit Tinggi, Klang-bound) to facilitate LRT3 project-related works from 15 August 2022 to 17 August 2022

KUALA LUMPUR – 12 AUGUST 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be road closure and traffic diversion on Jalan Batu Nilam (near Lotus’s Bukit Tinggi, Klang-bound) to facilitate LRT3 project-related works from 15 August
Read More

 
 

 
 
12 August 2022

Media Release: Road closure and traffic diversion on Federal Highway exit to Persiaran Sultan (Pusat Bandar Shah Alam-bound) to facilitate LRT3 project-related works from 15 August 2022 to 31 August 2022

KUALA LUMPUR – 12 August 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure and traffic diversion on Federal Highway exit to Persiaran Sultan (Pusat Bandar Shah Alam-bound) to facilitate LRT3 project-related works
Read More

 
 

 
 
1 August 2022

Media Release: Road closure and traffic diversions at Jalan Bridge 21/64 (near Petronas NGV) to facilitate LRT3 project-related works from 4 August 2022 to 8 August 2022

KUALA LUMPUR – 1 AUGUST 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure and traffic diversion at Jalan Bridge 21/64 (near Petronas NGV) to facilitate LRT3 project-related works from 4 August 2022
Read More

 
 

 
 
31 July 2022

Media Release: Continuation of road closures and traffic diversions on Jalan Langat, Klang (between Shree Muniswarar Temple and Persiaran Botanik junction, Klang-bound, and after Jalan Salam junction to Shell Bandar Botanik, Banting- bound) to facilitate LRT3 project-related works from 3 August 2022 to 31 August 2022

KUALA LUMPUR – 31 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of road closures and traffic diversions on Jalan Langat, Klang (between Shree Muniswarar Temple and Persiaran Botanik junction, Klang-bound, and after
Read More

 
 

 
 
29 July 2022

Media Release: Road closures and traffic diversions on Jalan Langat (between Lebuh Batu Nilam and Jalan Batu Nilam 1 junctions, (Klang-bound), and under the flyover (Banting-bound)) to facilitate LRT3 project-related works from 2 August 2022 to 31 August 2022

KUALA LUMPUR – 29 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be road closures and traffic diversions on Jalan Langat ((between Lebuh Batu Nilam and Jalan Batu Nilam 1 junctions, (Klang-bound), and under the
Read More

 
 

 
 
28 July 2022

Media Release: Continuation of temporary lane closures and traffic diversions on Persiaran Kerjaya between Sekolah Tinta Mas and Masjid An-Nur Temasya Glenmarie (Shah Alam and Kuala Lumpur/Subang-bound) and on Jalan Perintis U1/52 to facilitate LRT3 project-related works from 1 August 2022 to 26 December 2022

KUALA LUMPUR – 28 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of temporary lane closures and traffic diversions on Persiaran Kerjaya between Sekolah Tinta Mas and Masjid An-Nur Temasya Glenmarie (Shah Alam
Read More

 
 

 
 
28 July 2022

Media Release: Continuation of a full road closure and traffic diversions on Persiaran Kerjaya, Shah Alam (from Temasya Anggun residences to Denso, Subang/KL & Shah Alam-bound) to facilitate LRT3 project-related works from 1 August 2022 to 1 December 2022

KUALA LUMPUR – 28 July 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of a full road closure and traffic diversions on Persiaran Kerjaya, Shah Alam (from Temasya Anggun residences to Denso, Subang/KL
Read More

 
 

 
 
28 July 2022

Media Release: Continuation of lane closures and a traffic diversions on the New Klang Valley Expressway (NKVE) nearby Kelana D’Putera Condominium and Persada PLUS (Subang & Kuala Lumpur-bound) to facilitate LRT3 project-related works from 1 August 2022 to 30 November 2022

KUALA LUMPUR – 28 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of lane closures and a traffic diversions on the New Klang Valley Expressway (NKVE) nearby Kelana D’Putera Condominium and Persada PLUS
Read More

 
 

 
 
22 July 2022

Media Release: Road closures and traffic diversions on Jalan Langat, Klang (between Shree Muniswarar Temple and Persiaran Botanik junction, Klang-bound, and after Jalan Salam junction to Shell Bandar Botanik, Banting- bound) to facilitate LRT3 project-related works from 26 July 2022 to 2 August 2022

KUALA LUMPUR – 22 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be road closures and traffic diversions on Jalan Langat, Klang (between Shree Muniswarar Temple and Persiaran Botanik junction, Klang-bound, and after Jalan Salam
Read More

 
 

 
 
21 July 2022

Media Release: Lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) (from KM15.3 to KM16.2) opposite Damansara Legenda, Kuala Lumpur / Sungai Buloh-bound) to facilitate U-Girder launching and LRT3 project-related works from 24 July 2022 to 31 July 2022

KUALA LUMPUR – 21 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) (from KM15.3 to KM16.2) opposite Damansara Legenda, Kuala Lumpur /
Read More

 
 

 
 
15 July 2022

Media Release: Lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near the Damansara Interchange KM 17.0 and Ramp D (DMR1.4) nearby Merchant Square (Kuala Lumpur / Sungai Buloh-bound & Shah Alam / Subang-Bound) to facilitate Segmental Box Girder (SBG) launching and LRT3 project-related works from 15 July 2022 to 30 September 2022

KUALA LUMPUR – 15 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near the Damansara Interchange KM 17.0 and Ramp D (DMR1.4)
Read More

 
 

 
 
8 July 2022

Traffic Announcement: Road Closure and Traffic Diversion on Persiaran Dato’ Menteri, Shah Alam from 12 July 2022 to 31 July 2022

  KUALA LUMPUR – 8 JULY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure on Persiaran Dato’ Menteri (near Decathlon, Persiaran Damai-bound) and traffic diversion to facilitate LRT3 project-related works from 12
Read More

 
 

 
 
5 July 2022

Media Release: Intermittent road closures and traffic diversions on Lebuh Keluli, Shah Alam and Federal Highway 2 (Persiaran Bestari-bound and Klang-bound) to facilitate long span launching works and other LRT3 project related works from 8 July 2022 to 31 December 2022

KUALA LUMPUR – 5 July 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent road closures and traffic diversions on Lebuh Keluli, Shah Alam and Federal Highway 2 (Persiaran Bestari-bound and Klang-bound) to facilitate long
Read More

 
 

 
 
5 July 2022

Media Release: Intermittent road closures and traffic diversions on Persiaran Permai, Shah Alam (between Jalan Plumbum 7/95 to Persiaran Bestari junctions, (Persiaran Bestari and Uitm-bound)) to facilitate U-girder launching works and other LRT3 project related works from 8 July 2022 to 31 December 2022

KUALA LUMPUR – 5 July 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent road closures and traffic diversions on Persiaran Permai, Shah Alam (between Jalan Plumbum 7/95 to Persiaran Bestari junctions, (Persiaran Bestari and
Read More

 
 

 
 
29 June 2022

Traffic Announcement: Slip Road Closure and Traffic Diversion at Kayu Ara Interchange on SPRINT Highway (Damansara-Bound) from 1 July 2022 to 31 December 2022

KUALA LUMPUR – 29 JUNE 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of the slip road closure at the Kayu Ara interchange on SPRINT Highway (NKVE/ opposite Petronas NGV, Damansara-bound) to facilitate
Read More

 
 

 
 
21 June 2022

Media Release: Road closure on Persiaran Dato’ Menteri (near Decathlon, Persiaran Damai-bound) and traffic diversion to facilitate LRT3 project-related works from 24 June 2022 to 29 June 2022

KUALA LUMPUR – 21 JUNE 2021: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure on Persiaran Dato’ Menteri (near Decathlon, Persiaran Damai-bound) and traffic diversion to facilitate LRT3 project-related works from 24 June
Read More

 
 

 
 
17 June 2022

Media Release: Intermittent road closures and traffic diversions on Persiaran Permai, Shah Alam (between Jalan Plumbum 7/95 to Persiaran Bestari junctions, (Persiaran Bestari and Uitm-bound)) to facilitate U-girder launching works and other LRT3 project related works from 20 June 2022 to 30 June 2022

KUALA LUMPUR – 17 June 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent road closures and traffic diversions on Persiaran Permai, Shah Alam (between Jalan Plumbum 7/95 to Persiaran Bestari junctions, (Persiaran Bestari and
Read More

 
 

 
 
14 June 2022

Media Release: The slip road opposite the Shell station, at KM15.7 of New Klang Valley Expressway (NKVE), (Kuala Lumpur / Sungai Buloh-bound) will continue to be closed and traffic will be diverted to facilitate LRT3 project-related works from 16 June 2022 to 31 December 2022

KUALA LUMPUR – 14 JUNE 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that the slip road opposite the Shell station, at KM15.7 of New Klang Valley Expressway (NKVE), (Kuala Lumpur / Sungai Buloh-bound) will continue to be closed
Read More

 
 

 
 
12 June 2022

Traffic Announcement: Lane Closures and Traffic Diversions on KM7.9 to KM10.35 and KM8.9 to KM8.6 Motorcycle Lane, Federal Highway from 15 June 2022 to 31 December 2022

SHAH ALAM, SELANGOR – 12 JUNE 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on KM7.9 to KM10.35 (near Petronas and Shell Petrol Station, (KL-bound)) and KM8.9 to KM8.6 (near
Read More

 
 

 
 
10 June 2022

Media Release: Continuation of road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang / Shah Alam-bound) from 15 June 2022 to 30 June 2022

KUALA LUMPUR – 10 JUNE 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang / Shah
Read More

 
 

 
 
10 June 2022

Media Release: Road closure and traffic diversions on Jalan Langat (between Persiaran Batu Nilam 1 and Lebuh Batu Nilam junctions, Klang-bound) to facilitate LRT3 project-related works from 14 June 2022 to 18 June 2022

KUALA LUMPUR, 10 JUNE 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure and traffic diversions on Jalan Langat (between Persiaran Batu Nilam 1 and Lebuh Batu Nilam junctions, Klang-bound) to facilitate LRT3
Read More

 
 

 
 
7 June 2022

Media Release: Intermittent closures at the Pandamaran Interchange (Ramp A) from Jalan Langat heading to Kuala Lumpur, (Ramp B) from Kuala Lumpur heading to Jalan Langat and from KM18.5 to KM19.1 (both bounds) of the Shah Alam Expressway – SAE (KESAS) to facilitate railing installation and LRT3 project-related works from 9 June 2022 to 12 June 2022

KUALA LUMPUR – 7 June 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent closures at the Pandamaran Interchange (Ramp A) from Jalan Langat heading to Kuala Lumpur, (Ramp B) from Kuala Lumpur heading to
Read More

 
 

 
 
3 June 2022

Media Release: Continuation of a road closure and traffic diversion on Jalan Tropicana Selatan 1 (opposite Merchant Square) to facilitate LRT3 project-related works from 6 June 2022 to 30 November 2022

KUALA LUMPUR – 3 JUNE 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of a road closure and traffic diversion on Jalan Tropicana Selatan 1 (opposite Merchant Square) to facilitate LRT3 project-related works
Read More

 
 

 
 
30 May 2022

Media Release: Intermittent lane closures and traffic diversions on Jalan Johan Setia, Klang (before the Jalan Langat traffic light junction, both-bounds) to facilitate LRT3 project-related works from 2 June 2022 to 31 August 2022

KUALA LUMPUR – 30 May 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent lane closures and traffic diversions on Jalan Johan Setia, Klang (before the Jalan Langat traffic light junction, both-bounds) to facilitate LRT3
Read More

 
 

 
 
27 May 2022

Media Release: Continuation of road closures in stages at Jalan Bridge 21/64 (from Petron to Kayu Ara Business Park) to facilitate LRT3 project-related works from 1 June 2022 to 30 September 2022

KUALA LUMPUR – 27 MAY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closures in stages at Jalan Bridge 21/64 (from Petron to Kayu Ara Business Park) to facilitate LRT3 project-related
Read More

 
 

 
 
27 May 2022

Media Release: Continuation of lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near KM 14.1 (Kuala Lumpur / Sungai Buloh-bound & Shah Alam / Subang-Bound) to facilitate Segmental Box Girder (SBG) launching and LRT3 project-related works from 1 June 2022 to 31 August 2022

KUALA LUMPUR – 27 MAY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near KM 14.1 (Kuala Lumpur / Sungai
Read More

 
 

 
 
27 May 2022

Media Release: Temporary full road closures and traffic diversions along Persiaran Kerjaya, Shah Alam (both Shah Alam and Subang/Kuala Lumpur-bound) from 31 May 2022 to 31 August 2022

KUALA LUMPUR – 27 MAY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of temporary full road closures and traffic diversions along Persiaran Kerjaya, Shah Alam (both Shah Alam and Subang/Kuala Lumpur-bound) from 31
Read More

 
 

 
 
20 May 2022

Traffic Announcement: Lane Closure and Traffic Diversion on Flyover at Lebuh Bandar Utama from 24 May 2022 to 10 June 2022

  KUALA LUMPUR – 20 MAY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary lane closure and traffic diversion on the flyover at Lebuh Bandar Utama, heading to BU11 and BU12 to facilitate
Read More

 
 

 
 
13 May 2022

Media Release: Continuation of road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang / Shah Alam-bound) from 17 May 2022 to 31 May 2022

KUALA LUMPUR  – 13 MAY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang / Shah
Read More

 
 

 
 
27 April 2022

Media Release: Continuation of a full road closure and traffic diversion on Persiaran Kerjaya, Shah Alam (from Temasya Anggun residences to Denso, Subang/KL & Shah Alam-bound) to facilitate LRT3 project-related works from 1 May 2022 to 31 July 2022

KUALA LUMPUR – 27 April 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of a full road closure and traffic diversion on Persiaran Kerjaya, Shah Alam (from Temasya Anggun residences to Denso, Subang/KL
Read More

 
 

 
 
27 April 2022

Media Release: Continuation of lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) (from KM14.5 to KM14.6, Kuala Lumpur / Sungai Buloh-bound) to facilitate Segmental Box Girder (SBG) launching and LRT3 project-related works from 1 May 2022 to 31 August 2022

KUALA LUMPUR – 27 APRIL 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) (from KM14.5 to KM14.6, Kuala Lumpur /
Read More

 
 

 
 
27 April 2022

Media Release: Continuation of temporary lane closures and traffic diversions on Persiaran Kerjaya between Sekolah Tinta Mas and Masjid An-Nur Temasya Glenmarie (Shah Alam and Kuala Lumpur/Subang-bound) and on Jalan Perintis U1/52 to facilitate LRT3 project-related works from 1 May 2022 to 31 July 2022

KUALA LUMPUR – 27 APRIL 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of temporary lane closures and traffic diversions on Persiaran Kerjaya between Sekolah Tinta Mas and Masjid An-Nur Temasya Glenmarie (Shah Alam
Read More

 
 

 
 
15 April 2022

Media Release: Lane closure and traffic diversion at the slow lane of the SPRINT Highway (near PETRON Damansara Kayu Ara, Damansara Bound) to facilitate LRT3 project-related works from 20 April 2022 to 31 July 2022

KUALA LUMPUR – 15 APRIL 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a lane closure and traffic diversion at the slow lane of the SPRINT Highway (near PETRON Damansara Kayu Ara, Damansara Bound) to
Read More

 
 

 
 
4 April 2022

Media Release: Lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) from KM14.9 to KM16.2 (Kuala Lumpur / Sungai Buloh & Shah Alam / Subang-bound) to facilitate U-Girder launching and LRT3 project-related works from 7 April 2022 to 31 May 2022

KUALA LUMPUR – 4 APRIL 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) from KM14.9 to KM16.2 (Kuala Lumpur / Sungai Buloh &
Read More

 
 

 
 
1 April 2022

Media Release: Continuation of road closure and traffic diversions on Persiaran Permai, Shah Alam road median (opposite Jalan Plumbum 7/101 junction, UiTM and Persiaran Bestari-bound) from 1 April 2022 to 31 July 2022

KUALA LUMPUR – 1 April 2022:  Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closure and traffic diversions on Persiaran Permai, Shah Alam road median (opposite Jalan Plumbum 7/101 junction, UiTM and
Read More

 
 

 
 
31 March 2022

TRAFFIC ANNOUNCEMENT ROAD CLOSURE AND TRAFFIC DIVERSION ON NEW KLANG VALLEY EXPRESSWAY (NKVE) FROM 1 APRIL 2022 TO 30 APRIL 2022

KUALA LUMPUR – 29 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of a road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang /
Read More

 
 

 
 
31 March 2022

TRAFFIC ANNOUNCEMENT LANE CLOSURES AND TRAFFIC DIVERSION AT THE SLIP ROAD AT LEBUH BANDAR UTAMA (NEAR MING TIEN, DAMANSARA-BOUND) AND PLUS HIGHWAY (DAMANSARA AND KLANG BOUND) FROM 1 APRIL 2022 TO 31 AUGUST 2022

KUALA LUMPUR – 29 MARCH 2022 : Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent lane closures and traffic diversions at the slip road at Lebuh Bandar Utama (near Ming Tien, Damansara-bound) and parts of
Read More

 
 

 
 
31 March 2022

TRAFFIC ANNOUNCEMENT LANE CLOSURES AND TRAFFIC DIVERSION ON NEW KLANG VALLEY EXPRESSWAY (NKVE) FROM 1 APRIL 2022 TO 31 JULY 2022

KUALA LUMPUR – 29 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) nearby Kelana D’Putera Condominium and Persada PLUS (Subang &
Read More

 
 

 
 
21 March 2022

Traffic Announcement: Traffic Announcement: Continuation of Intermittent Closures and Traffic Diversions at Ramp A and Ramp B of the Pandamaran Interchange and from KM18.5 to KM19.1 (Both Bounds) of the Shah Alam Expressway – SAE (KESAS) from 24 Mar 2022 to 31 Mar 2022

  KUALA LUMPUR – 21 March 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of intermittent closures at the Pandamaran Interchange (Ramp A) from Jalan Langat heading to Kuala Lumpur, (Ramp B) from
Read More

 
 

 
 
17 March 2022

Media Release: Temporary full road closures and traffic diversions along Persiaran Kerjaya, Shah Alam (both Shah Alam and Subang/Kuala Lumpur-bound) from 20 March 2022 to 30 May 2022

KUALA LUMPUR – 17 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be temporary full road closures and traffic diversions along Persiaran Kerjaya, Shah Alam (both Shah Alam and Subang/Kuala Lumpur-bound) from 20 March 2022
Read More

 
 

 
 
15 March 2022

Media Release: Road closure and traffic diversion along Jalan Bridge 21/64, from PLUS Highway (near PETRON Damansara Kayu Ara, Damansara Bound) to facilitate LRT3 project-related works from 16 March 2022 to 31 August 2022

KUALA LUMPUR – 15 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure and traffic diversion along Jalan Bridge 21/64, from PLUS Highway (near PETRON Damansara Kayu Ara, Damansara Bound) to facilitate
Read More

 
 

 
 
14 March 2022

Media Release: Continuation of lane closures on Persiaran Kayangan rightmost lanes (both Bulatan Kayangan and Federal Highway-bound) to facilitate LRT3 project-related works from 16 March 2022 to 15 June 2022

KUALA LUMPUR – 14 March 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of lane closures on Persiaran Kayangan rightmost lanes (both Bulatan Kayangan and Federal Highway-bound) to facilitate LRT3 project-related works from
Read More

 
 

 
 
13 March 2022

Media Release: Lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) at KM14.2 to KM14.5 opposite Suria Damansara Condominium (Kuala Lumpur / Sungai Buloh-bound) for U-Girder launching and other LRT3 project-related works from 15 March 2022 to 31 March 2022

KUALA LUMPUR – 13 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) at KM14.2 to KM14.5 opposite Suria Damansara Condominium (Kuala
Read More

 
 

 
 
8 March 2022

Media Release: Intermittent closures at the Pandamaran Interchange (Ramp A) from Jalan Langat heading to Kuala Lumpur, (Ramp B) from Kuala Lumpur heading to Jalan Langat and from KM18.5 to KM19.1 (both bounds) of the Shah Alam Expressway – SAE (KESAS) to facilitate Long Span launching associated works and LRT3 project-related works from 11 March 2022 to 23 March 2022

KUALA LUMPUR – 8 March 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent closures at the Pandamaran Interchange (Ramp A) from Jalan Langat heading to Kuala Lumpur, (Ramp B) from Kuala Lumpur heading to
Read More

 
 

 
 
7 March 2022

Media Release: Continuation of road closures and traffic diversions on Jalan Langat, Klang (between Persiaran Batu Nilam 1 and Persiaran Botanik junctions, Klang-bound, and between Jalan Mahogani junction and Shell Bandar Botanik, Banting- bound) to facilitate U-Girder launching works and LRT3 project-related works from 9 March 2022 to 18 March 2022

KUALA LUMPUR – 7 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closures and traffic diversions on Jalan Langat, Klang (between Persiaran Batu Nilam 1 and Persiaran Botanik junctions, Klang-bound,
Read More

 
 

 
 
4 March 2022

Media Release: Temporary road closure and traffic diversion on Persiaran Kerjaya, Shah Alam to facilitate LRT3 project-related works from 8 March 2022 to 10 March 2022

KUALA LUMPUR – 4 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary road closure and traffic diversion on Persiaran Kerjaya, Shah Alam to facilitate LRT3 project-related works from 8 March 2022 to
Read More

 
 

 
 
3 March 2022

Media Release: Road closures and traffic diversions on Jalan Langat, Klang (between Persiaran Batu Nilam 1 and Persiaran Botanik junctions, Klang-bound, and between Jalan Mahogani junction and Shell Bandar Botanik, Banting- bound) to facilitate U-Girder launching works and LRT3 project-related works from 4 March 2022 to 8 March 2022

KUALA LUMPUR – 3 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be road closures and traffic diversions on Jalan Langat, Klang (between Persiaran Batu Nilam 1 and Persiaran Botanik junctions, Klang-bound, and between Jalan
Read More

 
 

 
 
3 March 2022

Media Release: Lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) from KM14.9 to KM16.2 (Kuala Lumpur / Sungai Buloh & Shah Alam / Subang-bound) opposite Ara Damansara Winchester to Damansara Lagenda, to facilitate U-Girder launching and LRT3 project-related works from 6 March 2022 to 31 March 2022

KUALA LUMPUR – 3 MARCH 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) from KM14.9 to KM16.2 (Kuala Lumpur / Sungai Buloh &
Read More

 
 

 
 
28 February 2022

Media Release: Lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near the Damansara Interchange KM 17.0 and Ramp D (DMR1.4) nearby Merchant Square (Kuala Lumpur / Sungai Buloh-bound & Shah Alam / Subang-Bound) to facilitate Segmental Box Girder (SBG) launching and LRT3 project-related works from 3 March 2022 to 31 May 2022

KUALA LUMPUR – 28 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near the Damansara Interchange KM 17.0 and Ramp D (DMR1.4)
Read More

 
 

 
 
20 February 2022

Media Release: road closure and traffic diversions on Jalan Langat (between Persiaran Batu Nilam 1 and Lebuh Batu Nilam junctions, Klang/Banting- bound) to facilitate U-Girder launching and LRT3 project-related works from 23 February 2022 to 6 March 2022

SHAH ALAM, SELANGOR – 18 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure and traffic diversions on Jalan Langat (between Persiaran Batu Nilam 1 and Lebuh Batu Nilam junctions, Klang/Banting- bound)
Read More

 
 

 
 
14 February 2022

Traffic Notice: Continuation of Road Closure and Traffic Diversion on Slip Road heading to LRT Glenmarie Station from 1 March 2022 to 10 April 2022

Date 1 March 2022 to 10 April 2022 Day Monday to Sunday Time 24 hours Reason To facilitate LRT3 project-related works   The road closure and traffic diversion are as shown on the map below: The diversions are implemented following the approval from the Majlis Bandaraya Shah Alam (MBSA). Throughout the National Recovery Plan (NRP) Phase 4, we will be
Read More

 
 

 
 
14 February 2022

Media Release: a continuation of the temporary road closure and traffic diversion on slip road heading to LRT Glenmarie to facilitate LRT3 project-related works from 1 March 2022 to 10 April 2022

SHAH ALAM, SELANGOR –14 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of the temporary road closure and traffic diversion on slip road heading to LRT Glenmarie to facilitate LRT3 project-related works
Read More

 
 

 
 
13 February 2022

Media Release: Continuation of the left lane closure on Jalan Lapangan Terbang Subang (Kuala Lumpur / Subang-bound) to facilitate LRT3 project-related works from 1 March 2022 to 31 August 2022

   SHAH ALAM, SELANGOR – 13 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of the left lane closure on Jalan Lapangan Terbang Subang (Kuala Lumpur / Subang-bound) to facilitate LRT3 project-related works
Read More

 
 

 
 
13 February 2022

Media Release – closure of the slip road located across the Shell station after the Subang Toll (Subang/Shah Alam-bound) and traffic diversion to facilitate LRT3 project-related works from 1 March 2022 to 31 August 2022

SHAH ALAM, SELANGOR – 13 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a closure of the slip road located across the Shell station after the Subang Toll (Subang/Shah Alam-bound) and traffic diversion to
Read More

 
 

 
 
11 February 2022

Media Release: Lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) at KM14.2 to KM14.5 opposite Suria Damansara Condominium (Kuala Lumpur / Sungai Buloh-bound) for U-Girder launching and other LRT3 project-related works from 16 February 2022 to 28 February 2022

SHAH ALAM, SELANGOR – 11 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) at KM14.2 to KM14.5 opposite Suria Damansara Condominium
Read More

 
 

 
 
10 February 2022

Media Release: Continuation of intermittent road closures in stages at Jalan Bridge 21/64 from Petron to Kayu Ara Business Park to facilitate LRT3 project-related works from 11 February 2022 to 31 May 2022

  SHAH ALAM, SELANGOR – 10 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of intermittent road closures in stages at Jalan Bridge 21/64 from Petron to Kayu Ara Business Park to
Read More

 
 

 
 
7 February 2022

Media Release: intermittent road closures and traffic diversions on Jalan Johan Setia, Klang (near the traffic light junction, both-bounds) to facilitate LRT3 project-related works from 10 February 2022 to 31 May 2022

SHAH ALAM, SELANGOR – 7 February 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be intermittent road closures and traffic diversions on Jalan Johan Setia, Klang (near the traffic light junction, both-bounds) to facilitate LRT3 project-related
Read More

 
 

 
 
7 February 2022

Media Release: lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) from KM14.9 to KM16.2 (Kuala Lumpur / Sungai Buloh & Shah Alam / Subang-bound) opposite Ara Damansara Winchester to facilitate U-Girder launching and LRT3 project-related works from 11 February 2022 to 28 February 2022

  SHAH ALAM, SELANGOR – 8 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) from KM14.9 to KM16.2 (Kuala Lumpur / Sungai
Read More

 
 

 
 
7 February 2022

Media Release: a continuation of a road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang / Shah Alam-bound) from 9 February 2022 to 31 March 2022

SHAH ALAM, SELANGOR – 6 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of a road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang
Read More

 
 

 
 
7 February 2022

Media Release: Temporary lane closures and traffic diversions to facilitate LRT3 project related works on Persiaran Kerjaya, Jalan Lapangan Terbang Subang and Jalan SS7/19 from 7 February 2022 to 1 March 2022

 SHAH ALAM, SELANGOR – 4 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be temporary lane closures and traffic diversions to facilitate LRT3 project related works on Persiaran Kerjaya, Jalan Lapangan Terbang Subang and Jalan
Read More

 
 

 
 
2 February 2022

Media Release: Continuation of lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near KM 14.1 (Kuala Lumpur / Sungai Buloh-bound & Shah Alam / Subang-Bound) from 8 February 2022 to 31 May 2022

SHAH ALAM, SELANGOR – 2 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be continuation of lane closures and traffic diversions on the New Klang Valley Expressway (NKVE) near KM 14.1 (Kuala Lumpur / Sungai
Read More

 
 

 
 
1 February 2022

Media Release: Lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) nearby Kelana D’Putera Condominium and Persada PLUS (Subang & Kuala Lumpur-bound) from 8 February 2022 to 31 March 2022

  SHAH ALAM, SELANGOR – 1 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) nearby Kelana D’Putera Condominium and Persada PLUS
Read More

 
 

 
 
1 February 2022

Media Release: Continuation of the slip road closure at the Kayu Ara interchange on SPRINT Highway (NKVE/ opposite Petronas NGV, Damansara-bound) to facilitate LRT3 project-related works from 3 February 2022 to 30 June 2022

SHAH ALAM, SELANGOR – 1 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of the slip road closure at the Kayu Ara interchange on SPRINT Highway (NKVE/ opposite Petronas NGV, Damansara-bound) to
Read More

 
 

 
 
26 January 2022

Media Release: Continuation of road closure on Persiaran Dato’ Menteri (near Decathlon, Persiaran Damai-bound) and traffic diversion from 5 February 2022 to 30 April 2022

   SHAH ALAM, SELANGOR – 26 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closure on Persiaran Dato’ Menteri (near Decathlon, Persiaran Damai-bound) and traffic diversion to facilitate I-beam launching
Read More

 
 

 
 
24 January 2022

Media Release: Lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) from 7 February 2022 to 30 April 2022

SHAH ALAM, SELANGOR – 4 FEBRUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be lane closures and a traffic diversion on the New Klang Valley Expressway (NKVE) from 7 February 2022 to 30 April 2022
Read More

 
 

 
 
24 January 2022

Traffic Announcement: Temporary slow lane closure and diversion on the Elite Highway nearby Acapella Suite Hotel, Shah Alam (from North-bound) KM 0.9 to KM 2.5 to facilitate LRT3 project-related works from 27 January 2022 to 20 February 2022

  SHAH ALAM, SELANGOR – 24 January 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary slow lane closure and diversion on the Elite Highway nearby Acapella Suite Hotel, Shah Alam (from North-bound) KM
Read More

 
 

 
 
21 January 2022

Media Release: Road closure and traffic diversions on Persiaran Kayangan, Shah Alam (in front of UiTM, Federal Highway-bound) to facilitate pier cap and U-girder launching works for the LRT3 project from 24 January 2022 to 31 January 2022

SHAH ALAM, SELANGOR –21 January 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure and traffic diversions on Persiaran Kayangan, Shah Alam (in front of UiTM, Federal Highway-bound) to facilitate pier cap and
Read More

 
 

 
 
19 January 2022

Media Release: Continuation of temporary road closure and traffic diversions on Jalan Tropicana Selatan 1 (heading to Merchant Square) to facilitate LRT3 project-related works from 20 January 2022 to 30 June 2022

SHAH ALAM, SELANGOR – 18 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of temporary road closure and traffic diversions on Jalan Tropicana Selatan 1 (heading to Merchant Square) to facilitate LRT3
Read More

 
 

 
 
17 January 2022

Media Release: Road closure on Jalan Langat (between Persiaran Batu Nilam 1 and Lebuh Batu Nilam junctions, Klang-bound) and traffic diversions to facilitate U-Girder launching and LRT3 project-related works from 20 January 2022 to 21 April 2022

  SHAH ALAM, SELANGOR – 17 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a road closure on Jalan Langat (between Persiaran Batu Nilam 1 and Lebuh Batu Nilam junctions, Klang-bound) and traffic diversions
Read More

 
 

 
 
17 January 2022

Media Release: Road closures and traffic diversions on Jalan Langat, Klang (between Persiaran Batu Nilam 1 and Persiaran Botanik junctions, Klang-bound, and between Jalan Mahogani junction and Shell Bandar Botanik, Banting- bound) to facilitate U-Girder launching works and LRT3 project-related works from 20 January 2022 to 28 February 2022

SHAH ALAM, SELANGOR – 17 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be road closures and traffic diversions on Jalan Langat, Klang (between Persiaran Batu Nilam 1 and Persiaran Botanik junctions, Klang-bound, and between
Read More

 
 

 
 
17 January 2022

Media Release: Continuation of a road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll (Subang / Shah Alam-bound) from 19 January 2022 to 31 January 2022

  SHAH ALAM, SELANGOR – 16 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of a road closure and traffic diversion on the New Klang Valley Expressway (NKVE) after the Subang Toll
Read More

 
 

 
 
17 January 2022

Media Release: Temporary closure of the motorcycle bridge at PLUS highway (Damansara and Klang highway) near Petron and BHP to facilitate LRT3 project-related works from 19 January 2022 to 22 January 2022

SHAH ALAM, SELANGOR – 17 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary closure of the motorcycle bridge at PLUS highway (Damansara and Klang highway) near Petron and BHP to facilitate LRT3
Read More

 
 

 
 
13 January 2022

Media Release: Emergency and Slow Lane Closures and Traffic Diversion on Elite Highway (South-bound) KM0.9 to KM2.5 from 17 January 2022 to 30 June 2022

SHAH ALAM, SELANGOR – 13 January 2021: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary closure and diversion of the emergency and slow lane on the Elite Highway nearby Acapella Suite Hotel, Shah Alam (from
Read More

 
 

 
 
10 January 2022

Media Release: Continuation of temporary lane closures and traffic diversions on the flyover at Lebuh Bandar Utama, heading to BU11 and BU12 to facilitate LRT3 project-related works from 12 January 2022 to 28 February 2022

SHAH ALAM, SELANGOR – 9 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of temporary lane closures and traffic diversions on the flyover at Lebuh Bandar Utama, heading to BU11 and BU12
Read More

 
 

 
 
7 January 2022

Media Release: Continuation of road closure and traffic diversions on Lebuh Keluli, Shah Alam (between Lorong Keluli 1c and Lorong Keluli 1a junctions, Federal Highway 2-bound) to facilitate U-girder launching works for the LRT3 project from 16 January 2022 to 16 February 2022

SHAH ALAM, SELANGOR – 7 January 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a continuation of road closure and traffic diversions on Lebuh Keluli, Shah Alam (between Lorong Keluli 1c and Lorong Keluli 1a
Read More

 
 

 
 
7 January 2022

Media Release: Temporary road closure and traffic diversion on Jalan Presiden F U1/F, Accentra Glenmarie to facilitate LRT3 project-related works from 10 January 2022 to 24 January 2022

SHAH ALAM, SELANGOR – 7 JANUARY 2022: Setia Utama LRT 3 Sdn Bhd (formerly known as MRCB George Kent  Sdn Bhd (MRCBGK)), the contractor of the Light Rail Transit 3 (LRT3) project, wishes to inform that there will be a temporary road closure and traffic diversion on Jalan Presiden F U1/F, Accentra Glenmarie to facilitate LRT3 project-related works from 10